国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

工地鋼筋加工棚搭建要注意什么?

來(lái)源:http://m.48ad.com/   發(fā)布時(shí)間:2022-01-11

1、工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長(zhǎng)和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長(zhǎng)與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來(lái),還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and so on. The length and width can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed shall also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing, the ground of the reinforcement processing shed shall be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there shall be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國(guó)際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語(yǔ)橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來(lái)定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, multiple steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings. The construction of the whole reinforcement processing shed is completed and standardized. Full assembly, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
木工加工棚
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for site reinforcement processing shed:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來(lái)定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed shall be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo sheets, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語(yǔ)的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at an eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the banner width should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In case of typhoon in southern China, windproof measures shall be taken, and wind ropes can be set.
感謝您的閱讀,此文的文章來(lái)源:木工加工棚更多的內(nèi)容和問(wèn)題請(qǐng)點(diǎn)擊:http://m.48ad.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is woodworking shed. For more information and questions, please click: http://m.48ad.com We will continue to work hard to provide you with services. Thank you for your support!

又色又爽又黄又粗暴的小说| 狠狠躁日日躁夜夜躁A片| 你是我的女人中文字幕高清| 青丝影院高清版在线观看| 国产仑乱无码内谢| 免费无码国产V片在线观看| 亚洲精品深夜AV无码一区二区| 色噜噜狠狠色综合AV| 亚洲国产精品一区二区美利坚| 成人家庭影院| 国产精品福利一区二区| 国产高潮流白浆啊免费A片动态| 国产精品人妻无码久久久| 色欲色香天天天综合网WWW| 久久精品国产亚洲AV麻豆网站| 不卡无码人妻一区三区音频| 无码人妻精品一区二区蜜桃网站| 解开人妻的裙子猛烈进入| 狼人无码精华AV午夜精品| 亚洲精品无码永久在线观看你懂的| 国产精品视频一区| 国产精品国产三级国产AV主播| YING荡的雯雯第三部分| 少妇久久久久久被弄到高潮| 护士故意露出奶头让我吃奶| 少妇无码一区二区三区免费| 日本精品一区二区三区在线视频| 老板把我抱到办公室揉我胸视频| 年轻丰满的继牳理伦片中文| 99精品国产在热2019| 人妻丰满熟妇AV无码区不卡| 公交车挺进朋友人妻的身体里| JAPANESE丰满少妇最高潮| 天天爽天天爽夜夜爽毛片| 少妇被躁爽到高潮无码人狍大战| 精品一区二区三区在线成人| 色噜噜狠狠色综合AV| 精品一区二区三区免费播放| 亚洲区小说区图片区QVOD| 美女无遮掩内衣胸罩| 亚洲AV无码国产精品色午友在线|