国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

木工加工棚的使用功能讓人員更

來(lái)源:http://m.48ad.com/   發(fā)布時(shí)間:2022-09-02

加工棚是建筑施工過(guò)程中操作人員或人行的必經(jīng)通道,過(guò)往人員的加工棚為雙層。從懸挑腳手架的懸挑處開(kāi)始,每隔十米設(shè)置一個(gè)懸挑式加工棚,可以更好地保證加工棚下行走人員的。下面就針對(duì)木工加工棚的使用就來(lái)講講吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters, which can better ensure the safety of people walking under the processing shed. Let's talk about the use of woodworking shed.
在施工過(guò)程中,在搭建加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工加工棚。
During the construction process, pay attention to protective measures when setting up the processing shed. The construction personnel shall carry out construction according to the construction requirements. Woodworking processing shed shall be set at the location of the open-air mixer, the site concrete mixer, the hoist shed, the steel bar shed, the wood shed, some entrances and exits and the site toilet.
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)技術(shù)培訓(xùn)和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Operators working at heights shall receive professional technical training and professional examination and take up their posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with fasteners in building construction and relevant standards.
安裝和拆除水平加工棚時(shí),操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。
When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, it shall be avoided to operate up and down at the same time and stagger the operation time. When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
木工加工棚
建造和拆除加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除加工棚時(shí),應(yīng)指定專人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。
During the construction and demolition of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. When constructing and dismantling the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety.
在雨天和大風(fēng)天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護(hù)加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。
In rainy and windy weather, the erection and removal of processing shed shall be suspended, and the quality of processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before setting up and removing horizontal protection, safety technical disclosure shall be conducted.
從中我們了解到在安裝加工棚的時(shí)候一定注意施工,施工人員按照施工要求進(jìn)行施工,同時(shí)還要保證搭建質(zhì)量,這樣才能實(shí)現(xiàn)保護(hù)的作用,這樣才能達(dá)到我們搭建的目的。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://m.48ad.com咨詢了解吧。
From this, we learned that when installing the processing shed, we must pay attention to construction safety. The construction personnel must carry out construction according to the construction requirements, and at the same time, we must ensure the construction quality. Only in this way can we achieve the protection function and achieve our goal of building. For more information, please visit our website http://m.48ad.com Consult and understand.

荫蒂添的好舒服A片| 欧美交换配乱吟粗大| 少妇撒尿W搡BBB搡WBBB搡| 免费播放男人添女人下边| 国产睡熟迷奷系列精品| 亚洲国产精品无码久久一区二区| 色-情-伦-理一区二区三区| 老师穿着旗袍肉色丝袜让我玩| 欧美VPSWINDOWS另类| 精品国产AV一区二区三区| 国产亚洲精品无码成人| 东北少妇不带套对白第一次| 熟妇高潮喷沈阳45熟妇高潮喷| 亚洲AV人无码激艳猛片服务器| 成人午夜福利视频| 久久天天躁狠狠躁夜夜不卡| 久久久久无码专区亚洲AV| 国产麻豆一精品一AV一免费| 亚洲人成网站999久久久综合| 又硬又粗进去爽A片免费| 成A人片亚洲日本久久| 97色偷偷色噜噜狠狠爱网站| 偷看农村女人做爰毛片色| 亚洲色欲色欲WWW在线丝| 亚洲同性男男GV在线观看| 最近2019中文字幕第一页视频| 女性C春合欢液高朝液精华液| 日本乱妇乱熟乱妇乱色A片| 国产一精品一AV一免费孕妇| 色婷婷AV视频一二三区| 亚洲国产精品无码中文在线| 强开小娟嫩苞又嫩又紧视频播放| 黑人巨大vs日本人优在线| 又大又长粗又爽又黄少妇视频| 狂猛欧美激情性XXXX大豆行情| 国产精品毛片AV久久66| 青春草无码精品视频在线观看| 国产精品亚洲专区无码牛牛| 国产成人啪精品视频免费软件| 免费精品国产人妻国语| 日本丰满大乳人妻无码苍井空|