国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

木工加工棚的使用功能讓人員更

來(lái)源:http://m.48ad.com/   發(fā)布時(shí)間:2022-09-02

加工棚是建筑施工過(guò)程中操作人員或人行的必經(jīng)通道,過(guò)往人員的加工棚為雙層。從懸挑腳手架的懸挑處開(kāi)始,每隔十米設(shè)置一個(gè)懸挑式加工棚,可以更好地保證加工棚下行走人員的。下面就針對(duì)木工加工棚的使用就來(lái)講講吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters, which can better ensure the safety of people walking under the processing shed. Let's talk about the use of woodworking shed.
在施工過(guò)程中,在搭建加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工加工棚。
During the construction process, pay attention to protective measures when setting up the processing shed. The construction personnel shall carry out construction according to the construction requirements. Woodworking processing shed shall be set at the location of the open-air mixer, the site concrete mixer, the hoist shed, the steel bar shed, the wood shed, some entrances and exits and the site toilet.
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)技術(shù)培訓(xùn)和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Operators working at heights shall receive professional technical training and professional examination and take up their posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with fasteners in building construction and relevant standards.
安裝和拆除水平加工棚時(shí),操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。
When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, it shall be avoided to operate up and down at the same time and stagger the operation time. When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
木工加工棚
建造和拆除加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除加工棚時(shí),應(yīng)指定專人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。
During the construction and demolition of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. When constructing and dismantling the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety.
在雨天和大風(fēng)天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護(hù)加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。
In rainy and windy weather, the erection and removal of processing shed shall be suspended, and the quality of processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before setting up and removing horizontal protection, safety technical disclosure shall be conducted.
從中我們了解到在安裝加工棚的時(shí)候一定注意施工,施工人員按照施工要求進(jìn)行施工,同時(shí)還要保證搭建質(zhì)量,這樣才能實(shí)現(xiàn)保護(hù)的作用,這樣才能達(dá)到我們搭建的目的。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://m.48ad.com咨詢了解吧。
From this, we learned that when installing the processing shed, we must pay attention to construction safety. The construction personnel must carry out construction according to the construction requirements, and at the same time, we must ensure the construction quality. Only in this way can we achieve the protection function and achieve our goal of building. For more information, please visit our website http://m.48ad.com Consult and understand.

在厨房抱住岳丰满大屁股| 视频播放器神器下载| 人妻系列无码专区久久五月天| 狠狠色综合7777久夜色撩人| 民工把我奶头掏出来了怎么办| 色戒假戏真做7分27秒视频| 色欲AV精品人妻一区二区三区| 久久久99精品免费观看| 国产一精品一av一免费爽爽| 同性两个17男互摸互吃的小说| 韩国三级日本三级人与波| 双乳被一左一右吃着动态图| 久久久受WWW免费人成| 1314女人裸体A片| 拔萝卜视频在线观看免费播放| 精品无码人妻一区二区免费AV| 国产在线综合色视频| 国模少妇一区二区三区| 一层一层剥掉女生的衣服的游戏| 亚洲AV色香蕉一区二区三区| 诱子偷伦初尝云雨孽欲天堂| 久久精品卫校国产小美女| 55夜色66夜色国产精品视频| 男人激烈吮乳吃奶视频免费| 欧美三日本三级少妇三级久久| 一路向西在线观看完整版| 无码AV免费一区二区三区试看| 很黄的吸乳A片三男一女| 精品国精品国产自在久国产| 粗大的内捧猛烈进出A片男男小说| 国产亚洲精品久久久无码| 西西人体做爰大胆性自慰| 欧美色视频日本片免费| 久久九九国产精品怡红院| 被调教跪着打屁股| 3D动漫精品啪啪一区二区免费| 国产XXXX99真实实拍| 无码国产精品成人午夜视频| 久久久久99精品成人片三人毛片| 亚洲AV永久无码精品天堂动漫| 无码人妻精品一区二区三区99|